feat: add control board replacement workflow

This commit is contained in:
lussierj committed 2026-08-02 14:34:16 +00:00
1 parent 62c91a2c3e
commit bcf1b4e3cf
16 files changed
+2122 -279

No files matched your search

+6 -5
View File
@@ -99,11 +99,12 @@ durable asset record. Repairs, maintenance, work orders, parts usage, equipment
movement, testing, and return-to-service history become coherent operational
records rather than disconnected actions.
The Begin Repair, read-only Repair Timeline, and Return to Service workflows are
complete. An authorized actor can open a repair against a durable miner UUID,
record sequenced events, and move the miner into or out of repair atomically.
Authorized readers can inspect the repair and its ordered immutable events.
Later repair lifecycle workflows remain planned.
The Begin Repair, read-only Repair Timeline, Return to Service, and Control Board
Replacement workflows are complete. An authorized actor can open a repair
against a durable miner UUID, record sequenced events, move the miner into or out
of repair atomically, and replace a control board without changing the durable
asset identity. Authorized readers can inspect the repair and its ordered
immutable events. Later repair lifecycle workflows remain planned.
Technician experience is a priority. Responsive and QR-assisted workflows may
reduce lookup and data-entry effort where they reinforce the same asset record.